On the Reports page, you can find, run, and schedule all reports available in Cinema Manager. The page includes a tab for each report class to help you find the type of report you're interested in.
Tip! To get the most out of your reporting, don't be afraid to explore. Vista has many reports, so if there's a particular metric you're interested in, it's likely to be found in at least one of them.
Filters
Experiment with filters to narrow your reports to the information you're really interested in.
Favourite reports
Click the star next to a report to have it appear in your Favourites tab. Your favourites are only visible to you, but report groups and classes are visible to all users.
Running a report
Run a report by clicking the Run icon. You'll need to enter any relevant parameters for the report to narrow down the information it displays.
Tip! Setting a small date range and limiting results to your own cinema can drastically improve the readability of a report, and save on paper.
When you run a report, it will appear under your recent activity on the Reporting Overview page with details of when it was last run. Hover over the report name here to see its date range, or click the Download icon to download a copy of the report with the same parameters.
Note: Report classes are set in Maintenance > Report Classes and will usually be the same across your whole circuit. Report groups are configurable within Cinema Manager for each site.
Incorrect results
Vista has a lot of reports, with similar-sounding labels. Carefully read the report's labels to be sure you understand the calculations they represent.
If you genuinely think a figure is incorrect, contact your IT department or your Vista support representative. They can investigate whether there's a problem with the data configuration or the software itself.
See Also:
Comments
0 comments
Please sign in to leave a comment.